This is a printer-friendly version of an article from Zip06.com.

09/10/2019 12:00 AM

Resurfacing Project on Route 80 in Killingworth and Deep River


The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be performed on Route 80 (Deep River Road) in Killingworth and Deep River from Monday, Sept. 16, through Monday, Oct. 14.

The project consists of milling and resurfacing a 7.72-mile segment of Route 80 in Killingworth and Deep River. The milling segment for this project is scheduled for Monday, Sept. 16 through Monday, Sept. 23. The resurfacing segment of this project is anticipated to be performed on Tuesday, Sept. 24 through Monday, Oct. 14. Work will be performed on Columbus Day, Monday, Oct. 14.

Motorists can expect lane closures to occur on Route 80 from Route 81 in Killingworth to Route 154 in Deep River. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The regular work schedule for this project is from 6:30 a.m. to 3:30 p.m. (Monday to Friday).

Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this vicinity.